A guide for commercial and industrial owners

Plan your commercial construction project in Texas.

Use Lilley's commercial construction planning checklist to organize the scope, site information, drawings and decisions for your first contractor conversation.

Start with the information you have

A useful first conversation.
A clearer path forward.

A Texas commercial construction project brings the site, structure, systems and business operation together. You do not need every answer to start the conversation. You do need a clear picture of what is known, what remains to be designed and the work you want the contractor to review.

This checklist reflects the discovery, scope planning, field coordination and handoff described in Lilley's construction process. Use it for a commercial building, industrial facility or a defined civil construction package.

Discuss your construction plans

Commercial project checklist

Six connected planning steps.

01

Define the facility and the business need

Describe what the commercial or industrial facility must do: its intended use, approximate area, operating needs, equipment and future phases. Distinguish a complete build from a defined site, utility, concrete or steel package.

  • Project address and intended use
  • Approximate building or site scope
  • Operational requirements and future phases
02

Gather the site information

Bring the survey, available geotechnical information, known utilities and access details. Identify the reviewing authority and design-team contacts with your project team. Record what is still unknown so the construction conversation starts with clear assumptions.

  • Available survey and site drawings
  • Known utility connections and access
  • Design-team and project contacts
03

Connect the construction disciplines

Site preparation affects the building pad. Underground services connect with foundations and concrete. Steel, equipment and finishes need to fit the facility's operation. Discuss these interfaces before treating the packages as unrelated estimates.

  • Site work and drainage interfaces
  • Foundation, slab and equipment requirements
  • Building systems and agreed finishes
04

Discuss budget and schedule as a scope

Share the budget range, target use date and any constraints on when work can take place. Identify the design decisions, access needs and owner-supplied items that affect the sequence. Pricing and scheduling should state the information and assumptions behind them.

  • Budget expectations and decision points
  • Target milestones and operating constraints
  • Owner-supplied items and scope assumptions
05

Compare the same construction scope

Use the same drawings and scope when reviewing proposals. Compare inclusions, exclusions, allowances and responsibilities before comparing totals. Clarify how changes are documented and which party coordinates work at the interfaces.

  • Comparable drawings and scope inclusions
  • Exclusions, allowances and responsibilities
  • Change and communication process
06

Plan field coordination and handoff

Agree how progress information, decisions and construction questions will be shared. Identify the closeout information and handoff requirements in the agreed scope, so the final phase is considered before field work begins.

  • Project communication and decision contacts
  • Scope-specific quality and completion requirements
  • Agreed documents and handoff information

Questions before construction

Bring the scope.
Build the plan.

The project team and agreed construction scope establish the responsibilities, decisions and information needed for your work.

What should I send a commercial contractor first?

Send the project address, intended use, approximate scope, available drawings and a target timeline. A site survey, utility information and budget expectations help the team understand what is known and what still needs to be developed.

Do I need complete drawings before contacting Lilley?

No. An early conversation can start with a site and a proposed use. The team can identify missing design or scope information; that conversation does not replace the project drawings or the responsibilities of the design team.

How do I compare commercial construction proposals?

Compare the same drawings, scope inclusions, exclusions and assumptions. Check how site work, utilities, foundations, structures, finishes and handoff responsibilities are addressed before comparing totals.

Can a defined site-work or industrial scope be reviewed separately?

Yes. Identify the boundaries of the proposed package, the other project parties and the information available for coordination. Lilley's service pages describe the commercial, industrial and civil capabilities to discuss.