Commercial · Civil · IndustrialTexas roots. Statewide reach.
All projects

Community

Go Church

Katy, Texas

Construction in progress2025–2026 project record
Go Church project in Katy, Texas

Project overview

Purpose in every phase.

A ground-up church project bringing site preparation, drainage, foundations and structural phases into one coordinated construction effort.

Discuss a project like this

Lilley’s scope

  • Excavation and grading
  • Drainage infrastructure
  • Reinforced concrete foundations
  • Turnkey construction coordination

Katy, Texas

LocationKaty, Texas
Project typeGround-up church construction
Record period2025–2026

The project purpose

A closer look
at the scope.

Create a new church facility in Katy through a ground-up commercial construction scope, beginning with the site and the infrastructure needed for the building.

How the work connects

The documented work connects excavation, grading and drainage with foundation preparation and reinforced concrete. Those stages establish the base for the structural construction that follows.

Construction in progress

2025–2026 project record

01

Site development

Excavation, grading and drainage infrastructure establish the construction site.

02

Foundations

Foundation preparation and reinforced concrete installation form the next connected phase.

03

Building coordination

The turnkey construction role carries the project through the foundation and structural phases described in the record.

Construction progress

Project photography follows the ongoing site, foundation and structural construction scope behind the new church facility in Katy.

Let’s build what’s next

Your vision.
Our next project.

Bring us your plans, your site or your next big idea. Let’s talk about what it takes to move it forward.

Discuss your project(936) 967-3941